Phase 1B - South Connector Pile Driving
June, 2006


Precast piles are inspected prior to installation

Traylor/Massman construction crew drives piles

pic
Phase 1B includes over 200,000 linear feet of 16 and 24 inch precast piles


A SERVICE OF THE LADOTD